• Woodcote High School UK

    Following a competitive tender procedure Blakedown were very pleased to have been awarded the track and pitch works for Woodcote High School in Surrey.

    Read this case study
  • Goals Soccer Centres UK

    Blakedown Sport & Play are proud to have worked with Goals building new facilities, resurfacing, regenerating and maintaining centres across the UK for the last 9 years.

    Read this case study
  • Brunel University Uxbridge, West London

    The 2012 Olympics provided a boom to Brunel’s already renowned sports facilities. The University, which has a long history of producing medal-winning athletes, was chosen as a training camp for Olympic sports teams, and a government fund enabled the facilities to be brought up to the highest international standards.

    Read this case study
  • Crawley Skatepark Crawley

    Building a skatepark requires specialist skill and precision — obviously the smoothness of the run is of paramount importance, both for performance and safety which Blakedown prides itself in achieving.

    Read this case study